We build dynamic, environmentally friendly buildings with clean indoor air.
Learn about our buildings.

The HUS CHILD PSYCHIATRY WARD was built of 41 prefabricated room elements. The building was built over five months in 2018.

The HUS ADDICTION PSYCHIATRY WARD is located in the protected Kivelä hospital area. The building elements meet the criteria set for the U-values of a permanent building.

The 3,000 m2 SEINÄJOKI CHILDREN’S HOSPITAL was built in six months. The construction materials were expected to meet at least the requirements of emission class M1.

The SOPHIE MANNERHEIM SCHOOL has accessible facilities on three floors. The building has, among other things, a 300 m2 gym and better than usual sound insulation.